
Add to Cart
Irrigation Barley Fodder machine equipment Hydroponic Fodder Trays barley maize corn sprout equipment
Introduction:
Bean sprouts machine can shorten the growth cycle of bean sprouts, especially in winter or low room temperature. Which can shorten half or more time cycle, only 7 days .
Features
7-day cycle lets you produce nutrient-rich fodder daily for just pennies a pound.
Water-saving nutrient film technique watering regimen eliminates the need for overhead watering and reduces humidity levels that may promote fungus and mold growth.
Sprouting growing channels are supported by galvanized framing.
Connect multiple systems to achieve higher yields of 500, 1,000 or 2,000 lbs. of fodder per day with our Multi-Unit Adapter Kit. Production Cycle for the Big Farm Livestock Grass Growing Hydroponic Fodder Machine:
1)Day 1: Pre-soaked swollen grains evenly spreading in the plastic tray, trays stacked on shelves.
2)Day 2: Seeds have begun to sprout roots and head after being soaked for 24 hours before planting.
3)Day 4: Tremendous growth in root bed occurs before growth of shoots/ heads. Healthy root beds will create a mass that resembles that of a tight knit carpet lifting the seed and shoot from the tray.
4)Day 6: Root bed is almost fully developed and growth transfers to shoots that have grown to 1″-2″ in overall height.
5)Day 7: Feeding Day-Growth so fast you can nearly see it! Fully developed shoots and root bed ready for feeding. Healthy root beds are hard to separate and shoots are 8″-10″ in overall height. From simple seed andwater comes healthy natural feed with no fertilizer and hormones added.
Fetures of bean sprouting machine:
1. Galvanized steel frame structure, the thermal insulation, waterproof, rust for complex color steel plate, internal framework for stainless steel.
2. Independent electrical plate (computer) can achieve: water less alarms, automatic adding water in tank.
Case:temperature display, high temperature alarm, body to be automatic heating, constant temperature, body air circulation
3. Water tank: temperature display, high temperature alarm, water tank to be automatic adding water, automatic heating, constant temperature, automatic pouring water, pouring water time interval display, pouring water delay display, manual drench water.
Notes of bean sprouting machine:
bean sprouts production ratio:1:10
Mung bean sprout production ratio: 1:12
Production cycle: 3~4 days
vegetable plant that is picked just after the first few true leaves have developed.
The Automatic hydroponics microgreen grow fodder system is designed to allow for more sunlight to reach
between each level. There is even enough space to add artificial lighting above each level. With 5 levels per rack
and 4 channels per level, the 20 channels will allow you to harvest a full channel 3-4 times per week.
1.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
2.PAYMENT TERMS:
50% of total amount should be paid by T/T as down payment ,the balance (50% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
3.DELIVERY CONDITIONS:
3.1 Delivery condition: FOB Qingdao/ Shanghai port or CIF destination Port.
3.2 Delivery terms: Within 10-14 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
4.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
5.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
6.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.